BUDGET: £180000

VIEW CASE STUDY
The temporary cooling installation was designed to provide immediate additional cooling capacity as well as to enable definitive information as to the accurate cooling KW required for the plant.
A prestige Private Members club turn to GalxC for Cigar conditioning.
A privately owned operation, based in the south east, Everest provide high quality data centres supported by a 2N infrastructure. These Tier 3-4 aligned centre’s serve SME’s needing rack space through to companies who require data halls.
GalxC Cooling Services Ltd has adopted the Hydrocarbon cooling systems technology since 2011 with the launch of its first Hydrocarbon prototype chillers range back in 2012